绿化工程定额与造价
一、绿化工程造价的计算方法
1. Calculation method of afforestation project cost
1.绿化工程造价包括:苗木预算价、种植费、成活率期养护费、管理费、利润、独立费、苗木差价、税金八部分组成。
1. The cost of greening works include: the budget price of seedling, planting fee, maintenance fee, management fee, profit, independent fee, seedling price difference and tax.
2.绿化工程取费基础:苗木预算价。
2. Foundation of the cost of green engineering: the budget price of seedlings.
二、绿化工程费率
Ii. Afforestation rate
1.种植费:大树10%、小树7%
1. Planting fee: 10% of trees and 7% of small trees
2.成活率期养护费:正常季节种植12%、反季节种植18%
2. Maintenance fee for survival rate: 12% in normal season and 18% in anti-season
3.管理费:3%
3. Management fee: 3%
4.利润:2.5%
4. Profit: 2.5%
5.税金:城市3.445%、乡镇3.292%
5. Taxes: 3.445% in cities and 3.292% in townships
三、绿化工程定额规定调整说明
3. Adjustment instructions for the green project quota
1.苗木预算价格包括:圃存价、挖掘费、泥球包扎费、吊装费、运输费、运输损耗、卸车费、种植损耗、采保费、植物检疫费、苗木经营利润等。
Price includes: 1. The seedling budget nursery stock price, to dig, mud ball bandage, lifting, transportation, transportation loss, discharge the fare, planting loss, insurance premiums, plant quarantine fees, nursery stock operating profit, etc.
2.种植费包括:苗木、草坪的种植及种植后的垃圾及废弃物的清运。大树种植还包括吊装机械费。
2. The planting fee includes: planting of seedlings, planting of lawn and the clearing of waste and waste after planting. Tree planting also includes hoisting machinery charges.
3.成活率期养护费包括:草绳绕树干费、常规支撑费、遮荫棚费、软式通气管费、人工费、水电费等。成活率期是指绿化工程竣工验收后起连续十二个月。
3. The maintenance fee for the survival rate includes: the cost of the straw rope around the trunk, the regular support fee, the shelter fee, the soft air pipe fee, the labor cost, the water and electricity charges, etc. The survival rate period is 12 months after the completion and acceptance of the greening project.
4.管理费包括:
4. Management fee includes:
(1)工程所在地范围内的建筑垃圾及其它障碍的清理和外运工作。费用由甲乙双方在合同中说明。
(1) cleaning and transportation of construction waste and other obstacles within the scope of the project. The fee shall be stated in the contract by both parties.
(2)工程所在地范围内原有苗木的起挖或砍伐挖根;起挖草皮或清除草皮工作。费用由甲乙双方在合同中说明。
(2) digging or cutting roots of existing seedlings within the scope of the project; To work on grass or turf. The fee shall be stated in the contract by both parties.
(3)原有苗木起挖后的土球包扎或打浆、修剪、出塘、装车搬运工作。费用按实结算。
(3) the soil ball after the original seedling has been excavated or pulping, pruning, out of the pond, loading and unloading work. The expenses are settled in real terms.
(4)废弃物运输、场地清理工作。费用按实结算。
(4) waste transportation and site cleaning. The expenses are settled in real terms.
(5)整理绿化用地费包括:排地表水;耙细、过筛;回填;找平、找坡等工作。
(5) the fee includes: drainage surface water; To rake and sift; Backfill; Leveling and finding work.
(6)种植土、营养土:土源由乙方提供,费用由甲乙双方在协商后在合同中注明。
(6) soil and nutrition soil: the soil source shall be provided by party b, and the cost shall be indicated in the contract after negotiation.
(7)土方造型:机械造型:高度2米以上每立方米1.5元、高度2米以下每立方米1元;人工造型:不分高度每立方米2元。
(7) earthwork model: mechanical modeling: 1 yuan per cubic meter above the height of 2 meters and a height of less than 2 meters; Artificial model: no height: 2 yuan per cubic meter.
(8)土方运输:按市政土方规定(不含土源费)。
(8) earthwork: according to the municipal earthwork regulations (excluding soil source fees).
(9)特殊支撑:业主因美化环境而对支撑提特殊要求的支撑(主要指用材)为特殊支撑。费用由甲乙双方协商后在合同中注明。
(9) special support: the support of the owner for the beautification of the environment and the support for the special requirements of the support (mainly the use of materials) is specially supported. The fee shall be indicated in the contract after negotiation by both parties.
(10)种植、养护中的水电费由乙方承担。电源、水源由甲方提供,装表计量。如不装表,水电费结算由甲乙双方协商后在合同中注明。
(10) the water and electricity bills in cultivation and maintenance shall be borne by party b. Power supply and water supply shall be provided by party a and shall be measured in meters. If not, the bill of water and electricity shall be indicated in the contract after negotiation by both parties.
(11)灌木种植涉及吊装机械,其费用按实结算。
(11) shrub planting involves hoisting machinery, whose costs are settled in real terms.
6.大树:从地表向上1.2米高处树木的胸径大于等于15厘米。
6. Big tree: the diameter of the tree at the height of 1.2m above the ground is greater than or equal to 15cm.
7.苗木规格主要指标:乔木以胸径、蓬径为主要控制指标;高为次要控制指标。灌木以蓬径为主要控制指标;干径次要控制指标。
7. Main indexes of seedling specification: the main control index of trees with the diameter of the breast and the diameter of the canopy; High is the secondary control index. The main control indexes of the shrub with the diameter of the canopy; Dry diameter secondary control index.
8.引进新品种苗木,没有公布预算价格的苗木由甲乙双方协商后在合同中注明。
8. The new seedlings are introduced, and the seedlings of the budget price are not disclosed in the contract after consultation by both parties.
9.反季节种植:为6、7、8、9月期间种植。
9. Seasonal planting: planting for 6, 7, 8, and 9 months.
10.正常养护:指成活率期结束以后的养护。费用由甲乙双方协商后在合同中注明。
10. Normal maintenance: the maintenance after the survival rate is over. The fee shall be indicated in the contract after negotiation by both parties.
11.苗木差价:实际采购价—苗木预算价。
11. Seedling price difference: the actual purchase price -- the price of the nursery stock.
12.没有预算价的,直接以采购价(至工地)进入预算价,并计取各类费用。
12. Without the budget price, direct the purchase price (to the construction site) into the budget price, and the various expenses shall be accrued.
13.管理费中含0.1%的定额测定费。
13. A fixed fee of 0.1 per cent of the management fee.
四、费率表
Iv. Tariff schedule
1.苗木预算总价
1. Total price of seedling budget
2.种植费:1*10%(7%)
2. Planting fee: 1 * 10% (7%)
3.成活率期养护费:1*12%(18%)
3. Maintenance fee: 1 * 12% (18%)
4.管理费:1*3%
4. Management fee: 1 * 3%
5.利润:1*2.5%
5. Profit: 1 * 2.5%
6.独立费
6. Independent fee
7.苗木差价:实际价—预算价
7. Seedling price difference: actual price -- budget price
8.税金:(1+2+3+4+5+6+7)*3.445%(3.292%)
8. Taxes: (1 + 2 + 3 + 4 + 5 + 6 + 7) * 3.445% (3.292%)